Integration in the Jordan power system of a 20 MW PV power plant

L. Rouco L. Sigrist

February 2013 - February 2013

Funding entity ESTUDIO DE INGENIERIA LYNKA, S.L.L


The study is aimed at checking the steady-state and the dynamic performance of a 20 MW PV power plant as connected to the Jordan power system.